Terms & Conditions - Aluminium Products

Please read these Terms & Conditions carefully before placing an order or proceeding with manufacture or installation.

Payment

Supply Only

  • 50% deposit required to place order.
  • Balance payable in full prior to collection or delivery.

Supply & Installation

  • 50% deposit required to place order.
  • 40% payable prior to delivery to site.
  • 10% payable immediately upon practical completion.
  • No manufacturing or installation will commence until payments are received in full.
  • Interest at 2% per month will be charged on overdue accounts.
  • No cheques accepted.
  • Bank charges for cash deposits will be added to the customer’s account.

Scope of Work

  • All quotations are for supply only unless installation is specifically included in writing.
  • Where installation is included, it is limited strictly to the agreed scope.

Measurements

  • All manufacturing is strictly based on approved dimensions.
  • Where KPJ has not been formally contracted to measure, all measurements are deemed supplied by the client or contractor.
  • KPJ accepts no responsibility for incorrect measurements unless agreed in writing.

Opening Preparation

  • All openings must be square, level, plumb, and suitable for installation.
  • Openings must allow adequate tolerances for installation.
  • KPJ accepts no responsibility for unsuitable openings or site conditions.

Site Conditions

  • The site must be accessible, safe, and ready upon arrival.
  • Additional labour or delays caused by site conditions will be charged separately.

Site Services & Access

  • The client must provide adequate site access, scaffolding, lifting equipment, and power where required.
  • Unless specifically included, KPJ does not provide generators, scaffolding, hoisting equipment, site protection, or storage facilities.
  • Additional costs caused by missing site services will be charged separately.

Delivery, Handling & Offloading

  • Delivery is drop-off only unless installation is included.
  • The client must provide sufficient labour for offloading.
  • All risk transfers upon delivery or collection.

Installation

  • KPJ installs strictly into prepared openings only.
  • Installation excludes builder’s work unless included in writing.
  • Final waterproofing and drainage depend on correct site preparation.
  • Additional work caused by site conditions will be charged separately.

Post-Installation Protection

  • The client assumes responsibility for protecting installed products.
  • KPJ accepts no responsibility for damage caused by plastering, painting, grinding, welding, dust, or construction activities after installation.

Protective Tape & Film

  • Protective tape is temporary only.
  • Protective coverings must be removed within a reasonable period after installation.
  • KPJ accepts no responsibility for residue, staining, or damage caused by prolonged retention of coverings.

Glazing

  • Where glass is included, glazing will follow standard aluminium system requirements.
  • KPJ accepts no responsibility for issues caused by building movement, incorrect installation, or third-party work.

Building Movement & Settlement

  • KPJ accepts no responsibility for operational issues caused by building movement, slab movement, roof deflection, settlement, or thermal expansion.
  • Adjustment or service work resulting from movement will be chargeable.

Snags

  • Snag items do not constitute incomplete work.
  • Snag items will be attended to within a reasonable period after final payment.

Practical Completion

  • Practical completion occurs once products are operational notwithstanding minor snags.
  • Cleaning or adjustments after completion of other trades are not considered defects.
  • Additional return visits may be chargeable.

Cleaning & Maintenance

  • The client must keep tracks, drainage holes, rollers, and hardware clean.
  • Failure to maintain products may void warranty claims.

Goods Acceptance

  • Goods must be inspected upon delivery or collection.
  • Any shortages or damages must be reported within 48 hours.
  • Failure to report issues constitutes acceptance of the goods.

Cancellation

  • Cancellation must be submitted in writing via email.
  • Orders will be invoiced according to production status.
  • No refunds apply to materials already manufactured or processed.
  • A handling fee of 15% may apply.

Price Validity

  • Aluminium, hardware, and glass prices are subject to supplier increases and exchange rate fluctuations.

Warranty & Liability

  • Warranty is limited to defective materials and workmanship.
  • Repairs or replacement are at KPJ’s sole discretion.
  • KPJ is not liable for direct, indirect, incidental, or consequential damages.
  • Warranty is subject to full payment, correct installation, and proper maintenance.

Third Party Warranties

  • Ironmongery and hardware: 1 year.
  • Powder coating: Project specific.
  • Glass: 10 years.
  • KPJ does not assume liability for third-party warranties.

Energy Performance

  • Products are supplied according to standard specifications unless otherwise agreed.
  • KPJ does not guarantee SANS performance compliance unless confirmed in writing.

Design & Information

  • Products are manufactured according to approved quotations.
  • The client is responsible for frame positioning, FFLs, and waterproofing details.
  • Critical performance requirements must be reviewed by a competent professional.

Lead Times

  • Estimated lead times are 15–20 working days from deposit and signed approval.
  • All instructions and changes must be confirmed in writing before manufacture.

Retention of Ownership

  • All goods remain the property of K Parker Joinery until paid in full.
  • KPJ reserves the right to recover unpaid goods.

General

  • This quotation supersedes all prior communication.
  • All approvals and variations must be confirmed via email.
  • E&OE applies.
  • By payment of the deposit, the client confirms acceptance of these Terms & Conditions.